Gumpher Electrical Service
Projects
Infrastructure
Pitt International Airport
Pittsburgh International Airport – Terminal Modification Project
Owner: ACAA
Subbed Under: Lighthouse Electric
Completion Date: 6/2025
Building Sq. Ft: 811,000 ft2
Architect: Gensler + HDR
Engineer: Michael Baker Int
General Contractors: PJ Dick / Hunt
Summary: Gumpher Electric is working under Lighthouse Electric on the 811,000 sq. ft. ACAA Terminal Modernization Program at Pittsburgh International Airport. The scope includes installation of raceways for telecom, security, paging, fire alarm, and DAS systems. This critical infrastructure supports a state-of-the-art communication network that will enhance passenger safety, operational efficiency, and overall connectivity throughout the new terminal.

Healthcare
UMPC Tower
UPMC Presbyterian Tower
Subbed under: Clista Electric
Completion Date: 6/2026
Building Sq. Ft: 1,200,000 ft2
Architect/Engineer: HGA + IKM
General Contractors: Whiting Turner/PJ Dick
Summary: Working under Clista Electric, our team is contributing to the new 1.2 million sq. ft. UPMC Presbyterian Tower in Oakland. The scope includes power, data, and lighting rough-ins for patient rooms and core areas. This essential work supports the development of a cutting-edge healthcare facility designed to enhance patient care, improve system reliability, and advance UPMC’s mission of medical innovation.
Industrial
Frank Fuhrer Warehouse
Frank Fuhrer Warehouse
Owner: Frank Fuhrer
Completion Date: 6/2023
Architect/Engineer: Design-Build
General Contractor: ARCO International
Summary: Gumpher Electric partnered with ARCO International on “Frank Fuhrer Warehouse,” a 330,000 sq. ft. cold storage warehouse and 8,000 sq. ft. maintenance facility for owner Frank Fuhrer. The design-build project featured a 4,000A, 480V electrical service to support extensive refrigeration and process systems, as well as complete power, lighting, and fire alarm installations. With additional office fit-outs, site lighting, and infrastructure for truck operations, the project expanded the client’s cold storage capacity and operational efficiency for large-scale distribution.

Retail Store
Shadyside Retail Store
Orr's Jewelry
Shadyside Retail Store
Contract Date: 10/2024
Completion Date: 8/2025
Building Sq. Ft: approx. 14,000 ft2
Architect: Gruen Associates
Engineer: Dialectic Engineering
General Contractors: Whiting-Turner
Summary: Gumpher Electric is proud to partner with Whiting-Turner on the new 14,000 sq. ft. Retail Store in Pittsburgh’s Shadyside neighborhood. This sleek, modern space exemplifies our attention to detail with clean, elegant lighting and sophisticated control systems. The project underscores Gumpher’s expertise in delivering high-end electrical craftsmanship for one of the world’s most recognizable brands.

Orr's Jewelry
Client: Orr's Jewelers
Contract Date: 4/2025
Completion Date: 11/2025
Building Sq. Ft: 10,250 ft2
Architect: Antunovich Associates
Engineer: McKim & Creed Inc.
General Contractor: Rycon Construction
Summary: Gumpher Electric is partnering with Rycon Construction on the new 10,250 sq. ft. Orr’s Jewelers location in Pittsburgh’s vibrant Strip District. The high-end retail space will showcase intricate lighting and advanced lighting controls to complement the store’s luxury aesthetic. This project highlights Gumpher’s precision conduit work, both in the detailed overhead layouts of the sales floor and the structured systems within the parking garage, helping bring an elevated shopping experience to one of the city’s fastest-growing neighborhoods.
Commercial
Cafe Conmigo
Café Conmigo – Airside & Landside
Owner: Café Conmigo
Architect: Moss Architects
Engineer: CGL Engineering
General Contractor: Rycon Construction
Contract Dates:
Airside: 4/2025 – 7/2025
Landside: 7/2025 – 10/2025
Building Sizes: 4,000 ft2
Summary: Gumpher Electric partnered with Rycon Construction on the Café Conmigo Airside and Landside café locations at Pittsburgh International Airport. Together, these projects showcase the brand’s expansion and commitment to high-quality design within the airport’s growing retail footprint. Gumpher’s scope includes complete power distribution, lighting, and receptacle installations as shown on the contract drawings. Each location features a 225A electrical panel—incorporating a 100-foot feed allowance for the Airside café and connection to an owner-provided disconnect at the Landside site. Coordinating closely with Moss Architects and CGL Engineering, the team delivered efficient, code-compliant electrical systems that support both the architectural vision and operational needs of these vibrant hospitality spaces.
Logistics
Sysco Coraopolis
Sysco Coraopolis
Owner: Bellissimo Distribution
Completion Date: 5/2024
Building Sq. Ft: 147,000 ft2
Architect/Engineer: Design Build
General Contractor: Arco International
Summary: Gumpher Electric partnered with Arco International on the new 147,000 sq. ft. Distribution facility for Sysco. The design-build project included underground service installation, a complete fire alarm system, office fit-out, cool temperature lighting for refrigerated areas, dock control equipment, vehicle charging stations, and emergency lighting throughout the warehouse. The completed work helped Sysco expand its regional distribution capabilities, improve energy efficiency, and support faster, safer operations for one of the nation’s leading food suppliers.

Pittsburgh International Airport – Terminal Modification Project
Infrastructure
Owner: ACAA
Subbed Under: Lighthouse Electric
Completion Date: 6/2025
Building Sq. Ft: 811,000 ft2
Architect: Gensler + HDR
Engineer: Michael Baker Int
General Contractors: PJ Dick / Hunt
Summary: Gumpher Electric is working under Lighthouse Electric on the 811,000 sq. ft. ACAA Terminal Modernization Program at Pittsburgh International Airport. The scope includes installation of raceways for telecom, security, paging, fire alarm, and DAS systems. This critical infrastructure supports a state-of-the-art communication network that will enhance passenger safety, operational efficiency, and overall connectivity throughout the new terminal.
Hitachi Energy Project Samurai
Client: Hitachi Energy
Contract Date: 7/2025
Completion Date: 2/2025
Building Sq. Ft: 140,000 ft2
Architect: R3A Architecture
Engineer: H.F. Lenz
General Contractor: Mascaro Construction Company
Summary: Gumpher Electric is working with Mascaro Construction on Hitachi Energy’s 140,000 sq. ft. “Project Samurai” facility in Mount Pleasant, PA. The project includes both renovation of existing office and manufacturing spaces and electrical installations for several new additions. Featuring extensive overhead and on-wall conduit work, as well as upgrades to existing switchgear systems, this project strengthens Hitachi Energy’s ability to produce critical high-voltage components that power electrical infrastructure across the region.
UPMC Presbyterian Tower
Healthcare
Subbed under: Clista Electric
Completion Date: 6/2026
Building Sq. Ft: 1,200,000 ft2
Architect/Engineer: HGA + IKM
General Contractors: Whiting Turner/PJ Dick
Summary: Working under Clista Electric, our team is contributing to the new 1.2 million sq. ft. UPMC Presbyterian Tower in Oakland. The scope includes power, data, and lighting rough-ins for patient rooms and core areas. This essential work supports the development of a cutting-edge healthcare facility designed to enhance patient care, improve system reliability, and advance UPMC’s mission of medical innovation.
Frank Fuhrer Warehouse
Industrial
Owner: Frank Fuhrer
Completion Date: 6/2023
Architect/Engineer: Design-Build
General Contractor: ARCO International
Summary: Gumpher Electric partnered with ARCO International on the Frank Fuhrer Warehouse, a 330,000 sq. ft. cold storage warehouse and 8,000 sq. ft. maintenance facility for owner Frank Fuhrer. The design-build project featured a 4,000A, 480V electrical service to support extensive refrigeration and process systems, as well as complete power, lighting, and fire alarm installations. With additional office fit-outs, site lighting, and infrastructure for truck operations, the project expanded the client’s cold storage capacity and operational efficiency for large-scale distribution.
Shadyside Retail Store
Retail Store
Contract Date: 10/2024
Completion Date: 8/2025
Building Sq. Ft: approx. 14,000 ft2
Architect: Gruen Associates
Engineer: Dialectic Engineering
General Contractors: Whiting-Turner
Summary: Gumpher Electric is proud to partner with Whiting-Turner on the new 14,000 sq. ft. Retail Store in Pittsburgh’s Shadyside neighborhood. This sleek, modern space exemplifies our attention to detail with clean, elegant lighting and sophisticated control systems. The project underscores Gumpher’s expertise in delivering high-end electrical craftsmanship for one of the world’s most recognizable brands.
Orr's Jewelry
Client: Orr's Jewelers
Contract Date: 4/2025
Completion Date: 11/2025
Building Sq. Ft: 10,250 ft2
Architect: Antunovich Associates
Engineer: McKim & Creed Inc.
General Contractor: Rycon Construction
Summary: Gumpher Electric is partnering with Rycon Construction on the new 10,250 sq. ft. Orr’s Jewelers location in Pittsburgh’s vibrant Strip District. The high-end retail space will showcase intricate lighting and advanced lighting controls to complement the store’s luxury aesthetic. This project highlights Gumpher’s precision conduit work, both in the detailed overhead layouts of the sales floor and the structured systems within the parking garage, helping bring an elevated shopping experience to one of the city’s fastest-growing neighborhoods.
Café Conmigo – Airside & Landside
Commercial
Owner: Café Conmigo
Architect: Moss Architects
Engineer: CGL Engineering
General Contractor: Rycon Construction
Contract Dates:
Airside: 4/2025 – 7/2025
Landside: 7/2025 – 10/2025
Building Sizes: 4,000 ft2
Summary: Gumpher Electric partnered with Rycon Construction on the Café Conmigo Airside and Landside café locations at Pittsburgh International Airport. Together, these projects showcase the brand’s expansion and commitment to high-quality design within the airport’s growing retail footprint. Gumpher’s scope includes complete power distribution, lighting, and receptacle installations as shown on the contract drawings. Each location features a 225A electrical panel—incorporating a 100-foot feed allowance for the Airside café and connection to an owner-provided disconnect at the Landside site. Coordinating closely with Moss Architects and CGL Engineering, the team delivered efficient, code-compliant electrical systems that support both the architectural vision and operational needs of these vibrant hospitality spaces.
Sysco Coraopolis
Logistics
Owner: Bellissimo Distribution
Completion Date: 5/2024
Building Sq. Ft: 147,000 ft2
Architect/Engineer: Design Build
General Contractor: Arco International
Summary: Gumpher Electric partnered with Arco International on the new 147,000 sq. ft. Distribution facility for Sysco. The design-build project included underground service installation, a complete fire alarm system, office fit-out, cool temperature lighting for refrigerated areas, dock control equipment, vehicle charging stations, and emergency lighting throughout the warehouse. The completed work helped Sysco expand its regional distribution capabilities, improve energy efficiency, and support faster, safer operations for one of the nation’s leading food suppliers.